Friday, September 19, 2008

Tilt-Con Corp. Completes Kohl's Job; Starts on Beacon Lakes Project in Miami

Beacon Lakes Building 12 warehouse in Miami will be 189,140 SF

MIAMI, FL – Tilt-Con Corporation, Tamarac, is under way on the new 189,140-square-foot Beacon Lakes Building 12 warehouse (top right photo) at 12600 NW 25th Street, Miami, under its contract with Flagler Construction, Miami.

Selected for its unrivaled performance and speed of execution, Tilt-Con utilizes its economical system for tilt-up concrete walls.

Ranked as Florida’s largest tilt-up concrete constructor by Engineering News-Record magazine, Tilt-Con’s scope of work includes foundations, slab-on-grade and tilt-up concrete wall panels. Designed by RLC Architects, Boca Raton, the project is slated for completion in December 2008. Tilt-Con’s South Florida office is located at 10601 State Street, Suite 10, Tamarac, FL 33321, phone 1-800-446-8458.



Two-Story Kohl's at 11800 Mills Drive, Kendall, FL Contains 96,487 SF


KENDALL, FL – Tilt-Con Corporation, Tamarac, completed the new 2-story, 96,487-square-foot Kohl’s department store at 11800 Mills Drive, Kendall, FL, under its contract with J. Raymond Construction Corporation, Longwood, FL.

Selected for its unrivaled performance and speed of execution, Tilt-Con utilized its economical multi-story system for tilt-up concrete walls.
Ranked as Florida’s largest tilt-up concrete constructor by Engineering News-Record magazine, Tilt-Con’s scope of work included foundations, slab-on-grade and tilt-up concrete wall panels. The project was designed by Christopher B. Goble, Tulsa, OK. Tilt-Con’s South Florida office is located at 10601 State Street, Suite 10, Tamarac, FL 33321, phone 1-800-446-8458.

Contact: Kenneth H. Cristol, 407-774-2515

No comments:

Post a Comment