Thursday, November 1, 2012

Tandem Construction Starts Work On Addition To The Academy of Scholastic Achievement



Academy of Scholastic Achievement, Chicago, IL
 CHICAGO, IL– Chicago-based Tandem Construction announces it has started work on a 2,000-square-foot addition to The Academy of Scholastic Achievement (ASA), a Youth Connection Charter School Campus (YCCS) located at 4651 W. Madison Street on Chicago’s West side.

When complete, the new space will serve as a science lab to support the non-profit, public charter high school’s holistic educational program for at-risk students. 

Dimitri Nassis
 “Having been involved with other school and non-profit projects in the past, we know the real satisfaction that comes from updating a facility to better serve the needs of children,” said Dimitri Nassis, CEO of Tandem Construction.

 “It’s been a real pleasure to work with ASA’s founder, Gladys Simpson and the project coordinator, Marvin Simpson, to plan this addition and to now finally see it underway and taking shape.”

 Built in a former parking lot adjacent to ASA’s current 9,000-square-foot two-story facility, the science lab addition is a steel joist and masonry structure that will seat approximately 24 students. Tandem will be installing ventilation hoods and special air circulation systems to support the space’s function as a lab classroom.

For a complete copy of the company’s news release, please contact:

Sarah Lyons,
(312) 267-4520

Kim Manning,
(312) 267-4527


No comments:

Post a Comment