Sunday, March 7, 2021

Murphy Development Begins Construction of Two Industrial Buildings at Brown Field Technology Park in Otay Mesa Area of San Diego, CA

 R. Michael Murphy

SAN DIEGO, CA – Murphy Development Company (MDC) announced that it has started construction of two speculative industrial buildings, Building A, a 105,150-square-foot building, and Building C, a 123,913-square-foot building, at Brown Field Technology Park (BFTP), a 52-acre corporate industrial and office park that flanks SR-905 at the Britannia Boulevard on/off ramp in the Otay Mesa area of San Diego, California.  

Completion of the two buildings is scheduled for the third quarter this year.

These state-of-the-art buildings will feature 32-foot clear heights, 4,000 amps of 277/480 volt power, manufacturing sewer and water capacity, ESFR sprinklers, concrete truck courts, wide column spacing, and high dock door ratios designed for distribution users. 

The buildings can accommodate a variety of requirements ranging from 50,000 to 229,063 square feet. 

Andy Irwin



JLL’s Andy Irwin, Ryan Spradling and Greg Lewis are overseeing leasing of the two buildings. 

“We continue to see demand in Otay Mesa from Fortune 500 companies who are looking for best-in-class buildings with access to the strongest labor market in Southern California,” said R. Michael Murphy, president of MDC.

  “Brown Field Technology Park offers potential tenants state-of-the-art design, large setbacks, impeccable corporate image and landscaping coupled with San Diego’s lowest occupancy costs.”

In addition to these two buildings, MDC is nearing completion of a 180,000-square-foot build-to-suit two building campus for Salvation Army on the Northern phase of the business park. 

They are also working on designs for the Southern phase of the project with plans to deliver buildings on that phase in 2022.


Ryan Spradling
 



BFTP is ideally locally located for business, adjacent to Brown Field Airport and positioned within a U.S. Department of Commerce Foreign Trade Zone which offers important tax incentives for local companies. Its flexible design allows for industrial, R&D, office, manufacturing and corporate engineering buildings.

The SR-905 freeway features a diamond interchange at the entrance to BFTP on Britannia Boulevard and has convenient access to the I-805 and I-5 Freeways, and the South Bay Expressway (SR 125 Toll Road). 

"Demand for industrial continues to surpass historical averages due to a major shift in e-commerce spending as well as growth in the manufacturing sector in Northern Mexico," said Irwin.  "Brown Field Technology Park offers superior features, access to transportation corridors and abundant labor.”

About Murphy Development

San Diego-based Murphy Development Company (MDC) has master planned and developed more than 10 million square feet of multi-phase corporate industrial and technology parks in San Diego. 

Greg Lewis 
MDC acquires land and develops best-in-class corporate parks with the goal of leasing buildings – or completing build-to-suits for sale or lease – to Fortune 500 companies.

 Murphy Development is currently marketing 31 acres at the Scripps Ranch Technology Park and 65 acres in Otay Mesa within its Brown Field Technology Park and The Campus at San Diego Business Park. 
 Plans for these projects include more than 2 million square feet of corporate headquarters, office and industrial facilities. 


CONTACT:

 David Ebeling

Ebeling Communications

949.861.8351

949.278.7851 (Cell)

david@ebelingcomm.com

  jll.com

www.MurphyDev.com.

No comments:

Post a Comment