
The facility, which replaces the original school built in 1962, expanded the current SchenkelShultz-designed Orange County middle school prototype from two to three stories.
The campus was re-designed using the academic house concept with each grade level located on a separate floor to create small learning communities. Balfour Beatty Construction, Orlando, served as construction manager for the project.
Contact: Kenneth H. Cristol, 407-774-2515.
No comments:
Post a Comment