Wednesday, November 9, 2022

Murphy Development Begins Construction of Two Industrial Buildings at Brown Field Technology Park in Otay Mesa Area of San Diego, CA

Kaitlin Arduino
 

 SAN DIEGO, CA, Nov. 9, 2022 – Murphy Development Company (MDC) has started construction on Phase II at Brown Field Technology Park (BFTP), a 52-acre corporate industrial park that flanks SR-905 at the Britannia Boulevard on/off ramp in the Otay Mesa area of San Diego, California. 

 This second phase will include two speculative industrial buildings, Building 1, a 102,099-square-foot building and Building 2, a 101,145-square-foot building. Completion of the two buildings is scheduled for the third quarter of 2023.

Andy Irwin

These state-of-the-art buildings will feature 32 -foot clear heights, 4,000 amps of 277/480 volt power, manufacturing sewer and water capacity, ESFR sprinklers, concrete truck courts, wide column spacing, and high dock door ratios designed for distribution users.

 The buildings can accommodate a variety of requirements ranging from 30,000 to 203,244 square feet. 

JLL’s Andy Irwin, Joe Anderson and Greg Lewis are overseeing leasing of the two buildings. 


 Joe Anderson

“In the evolving economy, we continue to see demand for best-in-class buildings in South San Diego County with access to the strongest labor market in Southern California,” said Kaitlin Arduino, president of MDC. 

“Brown Field Technology Park offers potential tenants state-of-the-art design, large setbacks, impeccable corporate image and landscaping coupled with San Diego’s lowest occupancy costs.”

In addition to these two buildings, MDC recently completed Phase I of Brown Field Technology Park and subsequently sold Phase I to Hines. 

 Phase I includes two buildings totalling 229,680 square-feet.  Both buildings are fully leased to Home Depot and other corporate tenants.


Rendering of Phase II at Brown Field
Technology Park (BFTP), a planned
52-acre corporate industrial park 
in the Otay Mesa area
 of San Diego, CA

BFTP is ideally located on the main freeway into Otay Mesa, adjacent to Brown Field Airport. Its flexible design allows for industrial, R&D, office, manufacturing and corporate engineering buildings.

The SR-905 freeway and the Britannia Boulevard diamond interchange and on/off ramps are contiguous with BFTP and provide convenient access to the I-805 and I-5 Freeways, and the South Bay Expressway (SR 125 Toll Road). 


Greg Lewis

"Demand for industrial space continues to remain strong in San Diego with South County seeing increased activity with its newer functional buildings and proximity to the border," said Irwin. 

 "Brown Field Technology Park offers superior features, access to transportation corridors and abundant labor.”


CONTACT:

 

David Ebeling

Ebeling Communications

949.861.8351

949.278.7851 (Cell)

david@ebelingcomm.com

Member of the National Association of Real Estate Editors (NAREE)

“PR Strategist for the Commercial Real Estate Industry:  I do what I love and love what I do.”

 

www.murphydev.com

 

No comments: