MIAMI-DADE COUNTY, FL – Tilt-Con Corporation, Tamarac, is under way on Westminster Christian School’s new 2-story, 22,250-square-foot cafetorium in Palmetto Bay (top right rendering) , under its contract with Burke Construction Group, Doral, FL.
Ranked as Florida’s largest tilt-up concrete constructor by Southeast Construction magazine, Tilt-Con utilizes its multi-story economical system for tilt-up concrete walls, and its scope of work includes foundations, slab-on-grade, tilt-up concrete wall panels and mezzanines.
Designed by The Corrales Group, Boca Raton, Tilt-Con’s scope of work is slated for completion in January 2009. Tilt-Con’s South Florida office is located at 10601 State Street, Suite 10, Tamarac, FL 33321, phone 1-800-446-8458.
Skanska Building 121,225-SF Elementary School in Broward County
BROWARD COUNTY, FL – Tilt-Con Corporation, Tamarac, is under way on Broward County Public Schools’ new multimillion-dollar 121,225-square-foot Elementary School Z in Parkland, in Broward County, FL.
The two-building, one- and two-story facility is located at Nob Hill Road and N. Pine Island Road.
Selected for the project by Skanska USA Building’s Dania Beach, FL, office, Tilt-Con is utilizing its economical multi-story system for tilt-up concrete walls.
Tilt-Con’s scope of work includes foundations, slab-on-grade, tilt-up concrete wall panels and mezzanines. Designed by Song + Associates, Palm Beach, FL, Tilt-Con’s work is slated for completion in January 2009.
Contact: Kenneth H. Cristol, 407-774-2515
No comments:
Post a Comment