MIAMI, FL – Orlando-based Tilt-Con Corporation is under way on Miami-Dade County Public Schools’ new 6-building 157,735-square-foot High School YYY-1 at 11035 SW 84th Street, Miami, FL, under its contract with Betancourt Castellon Associates, Inc. (BCA), FL. Selected for its unriv
aled performance and speed of execution, Tilt-Con utilizes its economical system for tilt-up concrete walls. Mark. W. Theisen Sr. (top right photo) is president of Tilt-Con Corp.
aled performance and speed of execution, Tilt-Con utilizes its economical system for tilt-up concrete walls. Mark. W. Theisen Sr. (top right photo) is president of Tilt-Con Corp.Ranked as Florida’s largest tilt-up concrete constructor by Engineering News-Record magazine, Tilt-Con’s scope of work includes foundations, slab-on-grade and tilt-up concrete wall panels. Slated for
completion in September 2008, the project was designed by Silva Architects, Miami, FL.
completion in September 2008, the project was designed by Silva Architects, Miami, FL. Tilt-Con’s South Florida office is located at 10601 State Street, Suite 10, Tamarac, FL 33321, phone 1-800-446-8458.
With approximately 500 employees, Tilt-Con Corporation’s headquarters is located at 1003 Orienta Avenue, Altamonte Springs, FL 32701. For more information, visit www.tilt-con.com.
CONTACT:
Kenneth H. Cristol, President, Cristol Marketing Company, 237 Hunt Club Blvd., Suite 102, Longwood, FL 32779 USA. PH 407-774-2515, FX 407-774-6647. Strategic Marketing, Brand Management, Publicity and Advertising, and Corporate Communications
No comments:
Post a Comment