Sunday, November 2, 2008

Edwards Construction Working on Projects Valued at $24M in Florida

$18.5M Nocatee Aquatics Park Amenity Center Will Have Four Swimming Pools

OCALA, FL – Edwards Construction Services, Inc.’s Residential Amenities division is under way on the $18.5 million Nocatee Aquatics Park Amenity Center project in the Town of Nocatee, under development by The PARC Group near Ponte Vedra in St. John’s County, FL.

The 78-acre recreational facility located at Nocatee Town Center Village will feature: a 2-story, 12,000-square-foot Nocatee Community Center with meeting space, a fitness center, bathhouse, pavilions, cabana and offices; and a resort-style Nocatee Aquatics Park with four swimming pools including a Junior Olympic pool with stadium-style seating for competitions and a 52-foot water slide tower.

Designed in “Florida Classical” architecture by Ervin Lovett & Miller, Jacksonville, the park will also feature a “lazy river” with cascading waterfalls and a whirlpool.

$1.8M CarQuest Distribution Center Expansion in Ocala, FL Nears Completion

OCALA, FL – Ocala-based Edwards Construction Services, Inc.’s Manufacturing and Distribution division is nearing completion on the new $1.8 million, 42,000-square-foot CarQuest Distribution Center expansion in Ocala, FL.

Designed by MacGregor Associates Architects, Atlanta, the project consists of sitework, slab-on-grade, relocation of existing tilt-wall panels, erection of new tilt-wall panels, structural steel roof framing, single-ply roofing, interior lighting and heating, ventilation and air conditioning upgrades.

$3.8M Iron Mountain Facility in West Palm Beach Will Have 50-Foot High Metal Building

WEST PALM BEACH, FL – Ocala-based Edwards Construction Services, Inc.’s Manufacturing and Distribution division is nearing completion on the new $3.8 million, 61,100-square-foot Iron Mountain facility located at 3501 Electronics Way in West Palm Beach, FL.

Iron Mountain globally provides information management, records management and data protection services.

Edwards’ scope of work includes erection of a new 50-foot-high, Pre-Engineered Metal Building and installation of metal wall and roof panels, a new fire sprinkler system and a multi-story racking system reaching 49 feet in height. The project was designed by Architectural Alliance, Fort Lauderdale.

Contact: Kenneth H. Cristol 407-774-2515

No comments: